UAH
"turnkey" construction of the plants on production of bioethanol for distillery in Rovno company BTS INZhINIRING | Order "Turnkey" construction of the plants on production of bioethanol for distillery Rovno (Ukraine) | BTS INZhINIRING : Allbiz
Premium Business
Reviews: 5
BTS INZhINIRING
+38 (063) 362-12-31
"Turnkey" construction of the plants on production of bioethanol for distillery
  • "Turnkey" construction of the plants on production of bioethanol for distillery
  • "Turnkey" construction of the plants on production of bioethanol for distillery

"Turnkey" construction of the plants on production of bioethanol for distillery

Price:
1 UAH
Description

The BTS - INZhINIRING company performs works both on construction, and on design of the bioetanolny plants, not only in the territory of Ukraine, but also the CIS countries, the European Union and Africa.

The Verkhovna Rada of 19.06.2012 approved the bill No. 10572 - 1 "About introduction of amendments to some laws of Ukraine concerning production and use of motor fuels with the maintenance of biocomponents" concerning bioethanol additives in gasoline. In particular, is established by the document that the recommended norm of bioethanol in gasoline which is made and/or implemented in the territory of Ukraine will make not less than 5% in 2013, since 2014 - 2015 the obligatory maintenance of biocomponents in motor fuels has to be not less than 5% , and since 2016 - not less than 7% .

Adoption of the called document is directed to decrease in dependence of the Ukrainian fuel market on import of energy carriers, and also to realization of mechanisms of the Kyoto Protocol on reduction of emissions of CO2 in the atmosphere.

To provide 5% the content of bioethanol in gasoline, Ukraine needs 320 million liters of bioethanol annually. There is an assumption that until the end of 2013 about 70 million liters of bioethanol will be formally manufactured in Ukraine.

 

Technical and economic justifications and calculations (feasibility study)

Our company will execute the feasibility study (feasibility study) on construction or reconstruction of the bioetanolny enterprise, will issue the specification (S), considering:

  • geographical arrangement of an estimated construction object;
  • choice, pricing, providing with raw materials;
  • complex processing of raw materials;
  • the most modern technology of processing of starchy or sugary raw materials;
  •  automatic control system (ACS) of production;
  • the minimum expenses of energy carriers, with a possibility of diversification of purchased organic fuel;
  • optimum consumption of technological waters and minimum influence on ecology.
 

Project and engineering

  • BTS - INZhINIRING, in optimum short terms, will provide implementation of projects with accurate respect for all standards of the legislation regulating performance of work on construction and technological design.
  • BTS - INZhINIRING owns last technologies in the field of distillation and rectification, power system, energy saving, warmly - and mass - exchanged processes and membrane technologies, including technologies of complex processing of starch - containing raw materials;
  • BTS - INZhINIRING on the basis of the membrane equipment and technologies micro, ultra, and nanofiltrations for division and a condensation of mixes with the purpose of receiving valuable components in production of ethanol, biofuel, vegetable oils and starches will provide full and waste - free environmentally friendly production;
  • BTS - INZhINIRING will introduce automatic process of management of production;
  • BTS - INZhINIRING will provide program maintenance, one and all, automatic management processes of production.
 

Supply of equipment, shefmontazh

Thanks to cooperation with many Ukrainian, European and Chinese producers we have a possibility of selection and supply of equipment for implementation of the project of the bioetanolny plant and the plant of complex processing of starch - containing raw materials.

Besides, we will provide additional service:

  • development of design decisions;
  • installation, installation (shefmontazh) equipment for distillation, rectification, dehydration, mill equipment;
  • automation;
  • adjustment and commissioning.

On all equipment delivered by our company after its introduction to operation the guarantee and service is provided. Podobor of the equipment and optimal variants of the order, delivery, installation and service are coordinated with the customer.

 

Commissioning

On completion of installation and construction works of the plant, together with representatives of the customer we accept the plant (shop) in operation, we perform balancing and commissioning which purpose is setup of the installed equipment, and also check of readiness of functioning of system in general.

The subsequent stage - maintenance and training of personnel by our highly skilled employees for further zealous functioning of the basic and additional productions.

Operability of network, with competent staff, completely ready to transfer to operation to the Customer is result of balancing and commissioning.

Information is up-to-date: 30.12.2021

Read more

Unbelievable price on "Turnkey" construction of the plants on production of bioethanol for distillery in Rovno (Ukraine) company BTS INZhINIRING.
LiveInternet